• ...
  • 2022 - 2024
  • Under construction
  • Cam Construct
  • Cam Construct

  • Office with housing unit

  • GFA: 402m² offices, 141m² residential

  • Sint-Denijs-Westrem, Kortrijksesteenweg

concept

The new construction project consists of 3 floors: the ground floor and the first floor will be used as offices/small businesses. A residential unit will be provided on the second floor.

Project Description

The site is located on the south side of the well-known Kortrijksesteenweg (N43), an important connection between Sint-Martens-Latem and Sint-Denijs-Westrem/Ghent.  This south side consists of a smaller grain and is oriented towards housing and small offices, between 100 and 500 sqm per unit.

 

The building is located 8 meters from the plot boundary on the Kortrijksesteenweg and approximately 4 meters from the lateral plot boundaries. The entrance to the underground parking is provided on the northeast side – in the extension of the existing driveway to the plot. Next to the entrance, a strip of 80 to 100 cm is provided to create a green separation. The rear building line fits within the line of the rear building lines of the other plots in the vicinity. From the second floor, the volume jumps back 6 meters at the back. On the third floor, a piece was taken out of the volume where a terrace is provided.

 

To ensure that there is a quality green area possible, the cover plate of the basement was provided deep enough so that a thick substrate layer is created and the terrain can be intensively greened.

 

To give the relatively small building volume a strong – yet calm – character, we opted for a facade finish in prefabricated concrete panels. The simplicity of the material makes the volume stand calmly in the street scene and fits in with the environment.

Horizontal lines are combined with vertical accents, giving the facade a dynamic and stylish character. In the front facade, a narrow canopy of 60 cm deep is provided above the ground floor to reinforce the horizontality, emphasize the entrance and make it partially covered.

 

The concrete look is combined with aluminium joinery in dark-bronze to black tones to show off the lines of the joinery.

The green roof above the basement is designed as a full-fledged, lush roof garden and consists of a combination of intensive, semi-intensive and extensive green zones combined with a path in water-permeable pavers.

More Projects

Commercial

Global Hotel Scheveningen

Commercial

AXXES 51-003

Commercial

Delen Private Bank - Coupure 102

Beursstand

Realty 2019

Assistentiewoning

Goed Arthur

Commercial

Take Off - Baltisse

Commercial

Blue Towers

Commercial

Archimede

Commercial

Take Off - Brantsandpatents

Commercial

Deminco

Commercial

Opera

Commercial

European Parliament

Commercial

Residentie Espark

Beursstand

Classica 2011

Commercial

Jardin Callier

Commercial

Optima

Commercial

Take Off - EY

Commercial

EVS Sint-Michiels

Commercial

Diamond

Commercial

Oude Bareel

Commercial

Take Off - Stadsontwerp

Commercial

Greenfield

Commercial

Office Bontinck Architecture and Engineering

Commercial

Castelnou Aparthotel

Commercial

Bofidi

Commercial

Axxes phase 1 and 2

Commercial

Bostoen

Commercial

Baltic Motors

Commercial

Dock 5

Commercial

Texaco Kruibeke

Commercial

Oude Vismijn

Commercial

Groenloo

Commercial

Station Gardens

Commercial

Texaco Mannekensvere

Beursstand

Brafa 2014

Commercial

Flanders Avenue

Commercial

Watermolenstraat

Commercial

Texaco Nazareth

Commercial

Wellness Reylof

Commercial

Da Vinci 1 and 2

Commercial

Cam Construct

Beursstand

Brafa 2012

Commercial

Brico Plan It

Commercial

BMW Premium Selection

Commercial

Take Off Goldwing

Beursstand

Realty 2016

Commercial

Kortedagsteeg

Hotel

Loop 5

Commercial

Dulle Griet

Commercial

LTG Building

Commercial

Tribeca

Commercial

Pier A Zaventem

Commercial

Elbeko

Beursstand

Brafa 2015

Office

Twin Gent

Commercial

Uitbreiding BMW Lochristi

Commercial

Poortakker

Commercial

Fun, BNP Paribas Fortis and JBC

Commercial

Maintenance Partners

Commercial

Post Plaza

Commercial

Q8 Drongen

Commercial

BMC

Beursstand

Realty 2017

Commercial

Site Gouwy

Commercial

Airport Business Center

Beursstand

Realty 2018

Beursstand

Mipim 2004

Commercial

Brielpark

Commercial

Gambrinus

Assistentiewoning

Dunant Gardens

Commercial

Brussels Airport

Beursstand

Mipim 2005

Commercial

Residentie Plato

Commercial

Gateway Terminal

Commercial

Take off Druppelgebouwen

Commercial

B-Park blauwe toren

Commercial

Reylof

Commercial

Blaisantpark

Commercial

Ring Hotel

Commercial

Take Off - Shortstay

Beursstand

Mipim 2006

Commercial

Hotel Yalo

Commercial

Welzijnsknoop

Commercial

Hof van Achten

Commercial

Riverside Garden

Commercial

Ibis Hotel

Commercial

Ghelamco Arena

Beursstand

Mipim 2007

Commercial

Dockside Gardens

Commercial

BMW Verstraeten

Commercial

Zaman

Commercial

Creas

Commercial

Baltisse

Assistentiewoning

Residence Beaux - Arts

Commercial

Delen Private Bank - Coupure 100

Beursstand

Mipim 2008

Interior

Delen Private Bank Knokke

Commercial

Beukenhof

Beursstand

Mipim 2009

Commercial

Schelde II

Commercial

Kinnarps

Beursstand

Mipim 2010

Commercial

Ghent Marriott

Commercial

De Ark

Commercial

SoGent

Beursstand

Mipim 2014

Commercial

Sint-Baafs

Commercial

Global Hotel Haarlem

Beursstand

Interieur 2016 - Private Bank Delen

Commercial

ICC

Commercial

Möbius

Commercial

Sofitel

Beursstand

Delen Private Bank Brafa 2023

Hotel

Vliegtuiglaan

Commercial

1898 The post

Commercial

Nieuwstraat Aalst

Commercial

Acerta

Commercial

Delen Private Bank Antwerpen

Commercial

Old offices Bontinck

Commercial

Sir Bruno

Commercial

MSK

...

Let's build together

Do you have a specific project you would like to discuss? Would you like to apply spontaneously?

Contact us, Katrien will be happy to help.

get in touch