bib
Sint-Martens-LatemConcept
The Sint-Martens-Latem library was a development project combining new construction with an existing building. The library and sports hall were connected by a transparent entrance building and footbridge. Each section of the library has its own interior design and architectural concept. The building also includes meeting rooms that can be laid out as required and a documentation centre/archive. Open-plan offices for library staff are located on the upper levels. The suspended office building creates a footlight strip allowing direct contact and surveillance of the library area.The upper-level walkway forms a logical connection between the library and the sports hall, but can also be shut off. The development project is an example of ecological building practices with its natural cooling, green roof and passive sun protection.
Information
| client | Sint-Martens-Latem District Council |
| site | Hoge Heirweg (Sint-Martens-Latem) |
| function | Public library |
| area | 1,240 mē library + 141 mē entrance/connecting building |
| building permit | April 2004 |
| study | 2006 |