airport
ZaventemConcept
This project involved the construction of a terminal and Pier B. The pier has forty boarding gates, measures 630 m in length and 30 m in width, spans five storeys and covers a total area of 79,000 m².The terminal forms a complex of functional buildings such as hallways, restaurants, shopping areas, offices, baggage handling/storage areas, a station, parking facilities, etc.
There is a clear demarcation between arrivals (VD+1) and departures (VD+2). Extensive use of glass and metal was made throughout all buildings. Interiors are light and provide a high level of passenger comfort.
The diamond in the front facade is covered with a glass, crown-shaped roof. The convex glass walls get larger on each ascending level until they ultimately provide a panoramic view of the entire airport at mezzanine level, where several restaurants are located.
This was a project completed by several architects – the G+D Studiegroep Dirk Bontinck, Willox, Jaspers, Montois and Van Campenhout.
Information
| client | BIAC |
| site | Airport (Zaventem) |
| function | Pier B extension |
| area | 125,000 m² |
| building permit | 1990 |
| completion date | 1994 |